User Manual

Installing the Charge Rack
4-19
DIAD 6 Charge Rack Manual
Left facing side rail/rack mounting position
The Charge Rack must be fastened to the wall with the approved hardware. DO
NOT use the tabs to permanently mount the Charge Rack.
10. Lift the Charge Rack into place on the mounting frame so that the tabs on the back of the
Charge Rack support the weight during installation.
Insert the four 3/8” x 1” Hex Head bolts through the 3/8” x 1 flat washers. Then place through
the mounting holes in sections one and four of the Charge Rack and into the u-channel spring
nut. Hand-tighten and repeat for all four locations, then torque down all bolts to 40 in lbs. with
appropriate wrench or socket. Use care not to over torque the bolts. Check to make sure the
Charge Rack is level. Plug the power cord into the existing power source.
Charge Rack Mounting Holes