User Manual

Installing the Charge Rack
4-16
DIAD 6 Charge Rack Manual
6. Insert the channel frame nut with the retainer into the channel frame where the Charge Rack
mounting hardware will be inserted, (see the following figure.) Insert the right nut with
retainer 6 3/4 inches from the right end of each channel. The center of the left nut with
retainer is installed 30 inches from the center of the right nut. Marking the front of the chan-
nel makes installation easier. These measurements will allow the Charge Rack to be installed
centered on the mounting frame. The channel frame nuts can be installed to the left or right of
these measurements if necessary. Keep in mind that access to the power cord is on the right
side of the Charge Rack. This is especially important in a stacked installation.
Attaching Charge Rack to Wall Mount Frame