User Manual

Installing the Charge Rack
4-15
DIAD 6 Charge Rack Manual
4. Make an indentation or small hole in the intended hole locations. Drill an appropriate hole
through the wall for each of the two, or more, 3/8” lag mounting screws. Refer to the follow-
ing table for the appropriate drill size for the wall materials encountered. Make sure that the
holes have penetrated the structural wall supports.
Hardware Mounting Recommendations
Inner Wall Material
Drill Sizes
Hardware
Washer
Wood
9/32” (0.281”) x 1/5” deep
Lag Screw
3/8” Flat
Steel (with hollow
wall)
7/16” (0.437”)
1/4” Molly Bolt of the
Appropriate Length*
0.265”x 0.875”
Fender
Cinder Block
7/16” (0.437)
1/4” Molly Bolt of the
Appropriate Length
0.265”x 0.875”
Fender
7/8” (0.875”)
5/16” Toggle Bolt**
3/8” Flat
Concrete, Solid
As Required
Lead Anchors
As Required
*For walls 5/8” to 1 - 1/4” thick
** Do not remove the bolts after inserting them into the wall.
5. One person should hold the mounting frame in place while the second person screws the 3/8”
lag screws and 3/8” flat washers into the prepared hold locations. Prior to tightening the
screws completely, check that the mounting frame is level. Adjust as necessary and complete
tightening the wall mounting screws.
Install all mounting frames with the sheared end (incomplete or partial right side) to
ensure that the mounting hole locations align properly. This is especially critical in multi-
ple stacked installations.