User Manual
Installing the Charge Rack
4-13
DIAD 6 Charge Rack Manual
New Installation Procedure
1. Determine the best mounting location for the installation. Check for the proper length from
the Charge Rack to a power outlet. Allow sufficient space above the Charge Rack; minimum
clearance between Charge Racks is 3 inches. In addition, allow sufficient space to the right of
the Charge Rack to access the electrical connections. The Charge Rack will extend 2 1/4
inches past the end of the mounting frame on both ends.
Charge Rack Installation Specifications
2. Identify the locations of the structural supports within the wall designated for mounting the
Charge Rack. Plant Engineering should verify and mark the correct structural mounting loca-
tion.
3. The following steps are easier to perform with two people: one person should hold the mount-
ing frame in place while the second person checks to make sure it is level and marks the hole
locations with the tip of a mounting screw, pencil, or pen. Two or more screws support each
channel of the mounting frame. If a second person is not available, use the mounting template
to mark the mounting hole locations. Failing to install a mounting frame could damage the
Charge Rack and result in issues charging/powering terminals located within the Charge
Rack.
Check with the responsible plant management group before drilling any holes
through walls. Extreme caution should be used to avoid contacting power lines.
Minimum distance between mounted DIAD 6 Charge Racks
is 3” (7.62 CM)