User Manual

Installing the Charge Rack
4-5
DIAD 6 Charge Rack Manual
plane of the back area of the Base Station at DIAD slot 4 and 12. Upon removal of screws, lift
Base Station and remove.
4. With the existing Base Station removed, check the condition of existing mounting brackets.
Ensure both the top and bottom u-channel brackets are level, square and properly secured to
wall. Check the condition and alignment of the u-channel spring nut. Properly align the
existing four u-channel spring nuts to the match hole in the new DIAD 6 Charge Rack. Coil
the existing communication cable and secure it away from the new Charge Racks. Coordinate
with local Plant Engineering and TSG on the complete removal of cabling, if possible. Cen-
ters will no longer use DIAD 5 Charge Racks. DIAD 6 will become the peak device in all
centers where DIAD 6 is deployed. DIAD 5 racks should be disposed of in accordance with
established procedures.
5. Lift the new DIAD 6 Charge Rack into place on the existing mounting frame so that the tabs
on the back of the Charge Rack support the weight during installation.
The Charge Rack must be fastened to the wall with the hardware removed in Step 3.
DO NOT use tabs to permanently mount the Charge Rack.