User Manual

Installing the Charge Rack
4-4
DIAD 6 Charge Rack Manual
The DIAD 6 Charge Rack must be installed in an interior location or climate-
controlled environment that is not subject to excessive dust or moisture and is
out of direct sunlight.
The ambient temperature of the mounting location for DIAD 6 Charge Racks
must remain between 32° F and 95° F (0° C and 35° C). Charging is not guar-
anteed if the ambient temperature exceeds these limits.
Required Parts and Hardware
The DIAD 6 Charge Rack Kit contains a Charge Rack and two side guards with sheet metal
screws. The kit does not contain the four mounting bolts required. Use the existing bolts from
your uninstall. The DIAD 6 Charge Rack is designed to mount on the previously installed DIAD 5
mounting frame.
Item (Quantity)
Part Number
DIAD 6 Charge Rack (1)
CN85-CR (wired)
CN85-WCR (wireless)
Side Guard Kit (1)
99EX-CR-NRGUARDKIT
Tools
Before attempting to install the DIAD Charge Rack, you must have the following tools:
9/16” Wrench or socket
Tape Measure
Level
Large Straight Blade Screwdriver
Small Straight Blade Screwdriver
Phillips Screwdriver
Replacement Installation Procedure
1. Locate the existing DIAD 5 Charge Racks within the facility. Ensure the Charge Rack is
empty of DIAD units. Have UPS operations remove all existing DIAD 5s. Locate the ON/
OFF toggle switch on the Charge Rack and turn to OFF. Unplug unit from electrical outlet.
Disconnect all data cables from the unit using a small straight blade screwdriver and cover the
cable ends with electrical tape.
2. Remove the top cover from the Base Station by unsnapping cover from slots located near rear
wall of Base Station. For stacked multiple Base Station mountings, remove mid cover and
upper Base Station and pry loose.
3. The following steps are easier to perform with two people. One person should hold the exist-
ing Base Station while the second person loosens the four 3/8-16 x 1” Hex Head Screws and
3/8” x 1 flat washers from the Base Station. Screws and washers are located on the vertical