User Manual

Installing the Charge Rack
4-3
DIAD 6 Charge Rack Manual
Requirements
All DIAD Charge Rack shipping containers and kits must be present. All required tools must be
present. Refer to the following section for the list of required tools depending on the type of
installation required.
The DCS computer MUST have all programs shut down and the computer
MUST be powered off prior to disconnecting any DIAD 5 Charge Racks.
Failure to do this will result in instability in the computer and will require TSG
intervention.
Procedure
1. Lay out and organize your tools in a clear area, preferably on an empty bench or table close to
the work area.
2. Organize the containers of the various Charge Rack components for easy access. Place them
at a comfortable distance so that unpacking them does not interfere with your work area.
3. Open all boxes and shipping containers. Take an inventory of the items received. Inspect hard-
ware for damage. DIAD 6 equipment questions (damages, shortages, overages, and/or incor-
rect serial numbers received) should be emailed by district coordinator to Julie Rutt via email
(nat1jar@ups.com). Please specify Region, District, SLIC and the serial numbers of any dis-
crepancies.
4. Lay the units out in their intended locations to determine if any problems exist before installa-
tion, paying special attention to power cord lengths.
Replacement Charge Rack Installation
This section describes how to remove the existing DIAD 5 Charge Racks and replace with new
DIAD 6 Charge Racks. The DIAD 6 Charge Rack is designed for horizontal wall mounting only.
It has been manufactured to be a direct replacement to the existing DIAD 5 Charge Racks. The
DIAD 5 and DIAD 6 Charge racks have the same footprint making utilization of existing mount-
ing hardware possible.
Do not install near other equipment or machines that routinely produce conduc-
tive dust.
DIAD 6 battery charging can be negatively affected by temperature extremes.
A fully loaded DIAD Charge Rack weighs 107.5 lbs (48.8 kg). The DIAD 6 and
DIAD 5 Charge Racks must be installed in a location that will support the
weight of the racks when fully loaded.