Install Instructions

USA-3
USA
CAN
MEX
D
Wiring
CAUTION
To ensure that the C6097 is not damaged dur-
ing operation, note the switching capacity, see
page5 (Technical data).
In the case of low switching capacities, such as
24V, 8mA, for example, we recommend using
an RCmodule (22Ω, 1μF) in air containing
silicone or oil.
1 Disconnect the system from the electrical power
supply.
½" NPT Conduit:
ø 0.4" (10 mm)
2
NO
1
NC
3
COM
½" NPT
2
NO
3
COM
1
NC
3 42
5
C6097A: the NO-to-COM connection is inter-
rupted if the pressure drops (contacts 3 and
2 open).
C6097B: the NC-to-COM connection is inter-
rupted if the pressure rises (contacts 3 and 1
open).
Adjustment
The switching point is adjustable via hand wheel.
1 Disconnect the system from the electrical power
supply.
2 Detach the housing cover.
Tightening torques, see Technical Information
bulletin C6097 at www.docuthek.com.
3 Connect an ohmmeter.
NO
2
NC
1
COM
3
COM
3
NC
1
NO
2
0
0.4" = 0.4"WC
(1 cm = 1 mbar)
4 Set the switching point using the hand wheel.
5 Connect a pressure gauge.
NO
2
NC
1
COM
3
COM
3
NC
1
NO
2
0
0.4" = 0.4"WC
(1 cm = 1 mbar)
6 Apply pressure. In doing so, monitor the ohm-
meter and the pressure gauge.
Adjusting range, switching differential and max.
inlet pressure, see page6 (Type table).
If the C6097 does not trip at the desired switch-
ing point, correct the adjusting range using the
hand wheel. Relieve the pressure and repeat
the process.
Pressure switches with manual
reset
C6097A3012, C6097A3038, C6097A3095,
C6097A3111 lock off if the pressure drops to
the set value.
C6097B3002, C6097B3028, C6097B3051 lock
off if the pressure rises to the set value.
1 Reset the pressure switch using the manual reset.
Requirement for reset:
C6097A: the pressure must have risen at least
to the set switching point plus the pressure dif-
ferential between the switching pressure and
possible lock-off.
C6097B: the pressure must have dropped at
least to the set switching point minus the pres-
sure differential between the switching pressure
and possible lock-off.
For details of the pressure differential between
the switching pressure and possible lock-off, see
page6 (Type table).
Tightness test
1 Shut off the downstream gas pipeline close to
the valve.
2 Open the valve and the gas supply.
Check all used ports for tightness.
3 4
Maintenance
In order to ensure smooth operation, check the tight-
ness and function of the C6097 every year, or every
six months if operated with biogas
.