Install Instructions
Accurate
pressure
set
point
adjustment
(stand
alone
only)
(tolerance
<3%
over
total
scale)
1.
Remove the screw from the test nipple inlet.
2.
Connect the tube of the pressure measurement device
to the nipple (Fig.
1.
F).
3.
Remove the cover of the pressure switch.
4.
Slowly release pressure of the main gas supply line until
the desired value
is
reached.
5.
Turn dial slowly until contact
1-3
opens and contact
2-3
closes.
6.
Replace the cover.
7.
Disconnect the pressure measurement device and
replace the screw.
Checkout
Checking
cut-off
pressure
After the installation
is
completed, continue with the following
procedures:
1.
Slowly close manual main valve with the burner
in
operation. Shut down should occur when the pressure
drops below the set point and the alarm
(if
connected)
should
be
energized.
2.
Re
open the manual main valve. The pressure should
rise and exceed the set point value, the burner should
start
up
and the alarm turn off after the reset button
is
depressed.
Honeywell
Combustion Controts Center Europe
Honeywell BV
Phileas Foggstraat 7
7821
AJ
Emmen, The Netherlands
Tel: +31 (0)
591695911
Fax: +31 (0)
591695200
EN1R-91729907R1-NE
Honeywell
UGV
S.r.l.
Via
Ferrero, 16
10090 Cascine-Vica Rivoli (TO)
Turin, Italy
Tel: +39 (11) 957
8311
Fax: +39 (11) 957
8322
4