Installation Guide

INSTALLATION JOB RECORD
AQ25A44B Programmable Boiler Relay Control Panel
System commissioning date: _________________________
Customer: _______________________________________
Building address: _________________________________
INSTRUCTIONS:
Fill in the details of the equipment connected to the control module and the zoning module:
A Low voltage control module wiring
B Low voltage zone thermostats
C Low voltage zone valves with end switches
D Line voltage Boiler pump, DHW pump and AUX output
E Review and set DIP switch settings - once DIP switches for the zoning module (AQ15740B) have been set, complete the “Installer
Settings” diagram by filling in the circles to indicate the DIP switch position set during installation
File this with other installation records for equipment used on this installation.
A Boiler Controller Module
D Boiler Pump, DHW, and AUX Device
B Zoning Thermostats
C Zoning Valves
Terminal # 9-10 13-14 17-18 19-20
Terminal ID Aux In DHW Boiler Aux Out
Function
Installer
defined
DHW
demand
Boiler
demand
Installer
defined
Equipment
Manufacturer
Model #
Serial #
Date Code
Notes
Terminal ID Boiler DHW AUX
Function
Boiler loop
control
DHW loop
control
Line voltage-rated
Aux device control
(installer-defined)
Equipment
Manufacturer
Model #
Power draw
(Amps)
Notes
Menu
Home
OK
M27622A
Terminal # 5-6 7-8 9-10 11-12
Terminal ID TH1 TH2 TH3 TH4
Function Zone call for heat
Equipment
Manufacturer
Model #
Date Code
Notes
Terminal ID Zone 1 Zone 2 Zone 3 Zone 4
Function Zone control
Equipment Valve Valve Valve Valve
Manufacturer
Model #
Power draw
VA
Notes
Zone 1
Zone 2 Zone 3
Zone 4
M27623A
E DIP switch
(See back for
settings)
This is a legacy product document
supported by Resideo. It is no
longer manufactured

Summary of content (4 pages)