AQ2554P2X Installation Job Record
INSTALLATION JOB RECORD
AQ25542B Expansion Zoning Panel for 4 Pumps
System commissioning date: _________________________
Customer: _______________________________________
Building address: _________________________________
INSTRUCTIONS:
Fill in the details of the equipment connected to the zoning module:
A Low voltage thermostats
B Line voltage pumps
C Review and set DIP switch settings - once the DIP switches have been set, complete the “Installer settings” diagram by filling in the circles
to indicate the DIP switch position
File this with other installation records for equipment used on this installation.
A Zoning Thermostats
B Zoning Pumps
Terminal # 5-6 7-8 9-10 11-12
Terminal ID TH1 TH2 TH3 TH4
Function Zone call for heat
Equipment
Manufacturer
Model #
Date Code
Notes
Terminal ID Zone 1 Zone 2 Zone 3 Zone 4
System Zone #
Function Zone control
Equipment Pump Pump Pump Pump
Manufacturer
Model #
Date Code
Power draw Amps
Notes
M27621A
Zone 1
Zone 2
Zone 3
Zone 4
M23720
A
AQ15540B