Install Manual
Table Of Contents
Fuel Conversion / Gas Connections
Installation Guidelines for 60 Hz Air-Cooled Generators 25
LP Vapor Installation (Typical)
Figure 5-7. LP Vapor Installation (Typical)
LP BTU/h = ft
3
/h X 2500
Megajoules/h = m
3
/h X 93.15
A Fuel data decal
B Minimum distance from rear obstruction—see Site Selection
C Manual shutoff valve (pressure port optional)
D Pipe nipple (field supplied)
E Flexible fuel line
F Check distance with gas provider
G Reinforcing rod
H Clamp
J Secondary fuel pressure regulator
K Manual shutoff valve
L Primary fuel pressure regulator
M Fuel tank—sized large enough to provide required BTUs/MJ for generator and
ALL connected appliance loads. Be sure to correct for weather evaporation.
001809
F
G
B
A
D
E
H
C
L
J
K
M