Install Manual

Table Of Contents
Fuel Conversion / Gas Connections
24 Installation Guidelines for 60 Hz Air-Cooled Generators
Natural Gas Vapor Installation (Typical)
Figure 5-6. Natural Gas Vapor Installation (Typical)
NG BTU/h = ft
3
/h X 1000
Megajoules/h = m
3
/h X 37.26
A Fuel data decal
B Minimum distance from rear obstruction—see Site Selection
C Manual shutoff valve (pressure port optional)
D Pipe nipple (field supplied)
E Flexible fuel line
F Check distance with gas provider
G Clamp
H Reinforcing rod
J Size gas meter for 100% generator load plus all appliance loads
K For underground installations, verify piping system for code compliance
LGas main
001808
F
G
H
K
L
J
E
D
A
B
C