User Guide
Table Of Contents
- 1. General
- 2. LonWorks C4 Option Board Technical Data
- 3. LonWorks Fieldbus C4 Option Board Layout and Connections
- 4. Installation of Honeywell NX LonWorks C4 Option Board
- 5. Commissioning
- 6. LonWorks Interface
- 7. Fault Tracking
- 8. Appendix 1
- 9. General Info
- 10. BACnet CJ Option Board Technical data
- 11. Bacnet Fieldbus CJ Option Board Layout and Connections
- 12. Grounding Cable Shield
- 13. Led Indications
- 14. Installation of Honeywell NX BACnet CJ Option Board
- 15. Commissioning
- 16. Fault Tracking
38 BACnet Grounding Cable Shield Honeywell
12.2 Grounding only one point on the net
In this manner of grounding, the shield is connected to ground only at the last device on the
net in the same way as described in chapter 12.1. Other devices of the net just pass the
shield.
We recommend you to use an Abico connector to fit the shields into the terminal.
1. Strip about 5 cm of the cable and cut off the grey cable shield. Remember to do
this for both bus cables (except for the last device).
2. Leave no more than 1 cm of the cable outside the terminal block and strip the data
cable at about 0.5 cm to fit in the terminals. See Figure 20.
Figure 20.
Note! Do this for both cables.
3. Fix both the cables on the frame with the clamp. See Figure 21.
Figure 21.
1 2 3 4 5
B
A
Shield