User Guide
Table Of Contents
- 1. General
- 2. LonWorks C4 Option Board Technical Data
- 3. LonWorks Fieldbus C4 Option Board Layout and Connections
- 4. Installation of Honeywell NX LonWorks C4 Option Board
- 5. Commissioning
- 6. LonWorks Interface
- 7. Fault Tracking
- 8. Appendix 1
- 9. General Info
- 10. BACnet CJ Option Board Technical data
- 11. Bacnet Fieldbus CJ Option Board Layout and Connections
- 12. Grounding Cable Shield
- 13. Led Indications
- 14. Installation of Honeywell NX BACnet CJ Option Board
- 15. Commissioning
- 16. Fault Tracking
36 BACnet Grounding Cable Shield Honeywell
12. Grounding Cable Shield
12.1 Grounding by clamping the cable to the converter frame (recommended)
This manner of grounding is the most effective and especially recommended when the
distances between the devices are relatively short or if the device is the last device on the
net.
Note: Normally, the CJ option board has already been installed in slot D or slot E of the
control CJ option board. It is not necessary to detach the whole CJ option board for the
grounding of the bus cable shield. Just detach the terminal block.
1 Strip about 5 cm of the cable and cut off the grey cable shield.
Remember to do this for both bus cables (except for the last device). See pictures
below.
2 Leave no more than 1 cm of the cable outside the terminal block and strip the data
cables at about 0.5 cm to fit in the terminals. See pictures below.
Note: Do this for both bus cables.
Figure 17.
Figure 18.
Cut here
Strip this part
1 2 3 4 5
B A