User Guide
Table Of Contents
- 1. General
- 2. LonWorks C4 Option Board Technical Data
- 3. LonWorks Fieldbus C4 Option Board Layout and Connections
- 4. Installation of Honeywell NX LonWorks C4 Option Board
- 5. Commissioning
- 6. LonWorks Interface
- 7. Fault Tracking
- 8. Appendix 1
- 9. General Info
- 10. BACnet CJ Option Board Technical data
- 11. Bacnet Fieldbus CJ Option Board Layout and Connections
- 12. Grounding Cable Shield
- 13. Led Indications
- 14. Installation of Honeywell NX BACnet CJ Option Board
- 15. Commissioning
- 16. Fault Tracking
Honeywell Installation of Lonworks Board 15
D
Install LonWorks C4 option board in
slot E on the control C4 option board
of the frequency converter. Make
sure that the grounding plate (see
below) fits tightly in the clamp.
21
22
23
H3
H2
H1
X5
lw1.fh8
E
Make a sufficiently wide opening for
your cable by cutting the grid as wide
as necessary.
F
Close the cover of the control unit
and the cable cover.