Installation Guide
GRNTBASE-INST
Rev B 03/15
CCB02-100BT/
CCB05-100BT Base
Installation Guide
Mounting a CCB02-100BT/CCB05-100BT
Base
The CCB02-100BT/CCB05-100BT Base can be
mounted on either a horizontal or vertical surface.
The cables can be routed through either the bottom or
the top of the base.
The cables can be routed down through the bottom of
the base, securing the cables in the wireways.
The cables can also be routed up through the top of
the base, crossing them over and securing the cables
in the wireways.
When routing the cables up through the top of the
base, be sure to cross the cables over before placing
in the wireways. If not, too much strain is placed on
the cable connectors.
When mounted on a vertical surface, a locking
system is used to secure the scanner when it is in the
stand. When mounted on a horizontal surface, the
locking mechanism should be set to unlocked
(pushed up). When mounted on a vertical surface, the
locking mechanism should be set to locked (pushed
down).
Locked
position for
vertical mount
Unlocked
position for
horizontal mount
Use 3 screws, appropriate for the mounting surface
material, to mount the base securely.
Limited Warranty
Refer to www.honeywellaidc.com/
warranty_information for your product’s warranty
information.
Patents
For patent information, see www.hsmpats.com.
Disclaimer
Honeywell International Inc. (“HII”) reserves the right to
make changes in specifications and other information
contained in this document without prior notice, and the
reader should in all cases consult HII to determine whether
any such changes have been made. The information in this
publication does not represent a commitment on the part of
HII.
HII shall not be liable for technical or editorial errors or
omissions contained herein; nor for incidental or
consequential damages resulting from the furnishing,
performance, or use of this material.


