Install Instructions
Table Of Contents
- About the ERM5220R
- Installation Checklist
- Terminal Designations
- Installation
- Troubleshooting
- Specifications
- Separable Parts
- FCC Regulations
- IC Regulations
- 5 Year Warranty
- Installation
- Dépannage
- Caractéristiques
- Pièces Séparables
- Règlements de la FCC
- Réglementation IC
- Garantie de 5 ans
- Instalación
- Localización y solución de problemas
- Especificaciones
- Partes Separables
- Regulaciones de la FCC
- Regulaciones IC
- Garantía de 5 Años
33-00135EFS—03 12
Checkout
Power the system on. Use the thermostat to start a cooling or heating
cycle, testing the ERM.
1. Restore power to the compressor/boiler as well as your RedLink
system.
2. Raise/lower the set point on the zone thermostat to initiate a call
for heat/cooling.
3. Observe all control devices to ensure operation and heat/cooling is
active.
4. Lower/raise the set point on the thermostat to suspend the call for
heat/cooling.
5. If outdoor temperature sensor is used, check thermostat to see the
readings are active and accurate.
6. Be sure to set thermostat to the desired settings when checkout is
complete.
33-00135EFS_B.book Page 12 Wednesday, November 11, 2015 11:31 AM