User Manual
Commissioning
SmartRadar FlexLine Part No.: 4417.762_Rev07
6 - 96 Service Manual
6.6.11.6 Overfill Protection Application Wiring
☛ Connect the external wiring (see illustrations below):
• Connect terminal 48 to the pump or to the valve.
• Connect terminal 49 to the mains.
6.6.11.7 Commissioning the Overfill Protection Application
To configure the Overfill Protection Application all essential boards
needs to be configured.
6.6.11.7.1 FII-DO (redundant)
☛ Make sure all jumpers are set to Normally Open (N.O.). See 6.6.3.1.
☛ Set the
[Board Instance] entity of each FII-DO board to a different value
(e.g. 0 and 1).
The boards are redundant and share the same board ID, so to be
able to address the board uniquely by the internal (CAN-bus) or
external FlexConn protocol, the board instance must be different to
distinguish the boards from each other.
☛ Set the
[Counterpart Board Instance] entity of each FII-DO board to the
[Board instance] of the counterpart FII-DO board (redundant board).
R3
R3
R4
R4
Ry3_b
Ry4_b
19
21
Ry3_a
Ry4_a
Ry3_b
Ry4_b
Ry3_a
Ry4_a
18 20
19 21
18
20
Ofp_b
Ofp_a
49
48
CN3 FII-DO 1
CN3 FII-DO 2
14 15 16 17
18 19 20 21
FII-DO 1
14 15 16 17
18 19 20 21
FII-DO 2
CN2 (R1 + R2)
CN3 (R3 + R4)
Ofp_b
49
Ofp_a
48