User's Manual
Table Of Contents
- Preface
- Table of contents
- 1 Introduction
- 2 Safety
- 3 Commissioning
- 4 Service and troubleshooting
- Appendix A Article and part numbers
- Appendix B ASCII table
- Appendix C PCB layout
- Appendix D Related documents
- Index
BD =
new
0.036568
1-
2
x 1-
0.0013372
0.254
2
17
17 - 0.005
= 0.2576 [m]
Commissioning
Instruction manual 973 SmartRadar LT Page 35
An example with an S10 antenna:
Item
BD
is programmed as 254 mm.
At 19 m level, the deviation of the SmartRadar LT level is: -2 mm;
At 2 m level, the deviation of the SmartRadar LT level is: +3 mm.
Note:
After the new stilling well diameter is programmed, the SmartRadar LT must be set to level with the RL
and AR sequence.
Hence, the procedure to follow is:
Item Name Description
W2
= Protection level 2 Enter password 2.
BD
= Stilling well diameter Recalculated stilling well diameter.
RL
= Reference level Reference level from manual measurement.
EX
Exit Exit protection level.
W2
= Protection level 2 Enter password 2.
CM
Commissioning mode Enter commissioning mode to accept the reference level.
AR
Accept reference The reference level, given by item
RL
, will now be accepted as
the radar level.
EX
Exit Exit protection level.