Instructions / Assembly
Step 29: Make sure
sidewall fits tight at back
corner, and secure bot-
tom 2 x 3 of sidewall to
floor with four 3" deck
screws through 2x3 into
2 x 6 joist.
Step 30: Position left sidewall
on left side of base making sure
it fits tight up against the back
wall and secure to loft with four
3" deck screws. The left side-
wall will also have a 3" x 5-1/2"
opening at the top back corner
for the swing arm.
Step 24: Position slide at front left opening of floor keep-
ing centered between posts and no deeper than 8" from
edge of poly decking. Secure with two 1" pan head
screws through the top of slide into poly decking.
Step 25: You are ready to
start assembling your play-
house. Grab back wall with
no window and gable top.
Position at back of floor with
siding overlapping
floor at bottom.
Step 26: Keep end wall
studs 2 1/2" from each
side of the floor.
Step 27: Secure back wall
to floor with four 3" deck
screws through 2 x 3 bot-
tom plate into 2 x 6 floor
joist.
Step 28: Position right
side sidewall with the 3" x
5-1/2" opening (see step
#52) at the top back cor-
ner for the swing arm.
Step 31: Install the
front wall by lifting up
on to loft and position
be-tween sidewalls;
make sure corners fit
tightly.
© Pinnacle Play Systems page 7