Instructions / Assembly

Step 12: When you have installed four 1/2" x 4-3/4" carriage bolts in each post ( twenty
total), secure bolts with 1/2" washer, lock washer, and nut on the threads of the carriage
bolts inside the recessed holes of the posts.
Step 13: Tighten 1/2" nuts with 3/4" socket wrench mak-
ing sure that base and floor are square to posts. Be
careful not to over tighten, stop tightening when head of
carriage bolts start to sink into 2 x 6's.
Step 14: When all twenty
bolts are tightened the play
set is ready to stand up.
With a person on each side
stand structure upright on
base.
Step 15: Check to make sure structure is square and
level. It may be necessary to add some blocks or fill
under posts to make level. Confirm that the unit is rotat-
ed exactly as you want it to be positioned in your yard.
Step 16: Install 5'x6' floor
to playhouse, the 2x3
joists on the floor drop
down beside 2x6 joists
of the loft floor. Keep the
2x3s that are cut short
towards the back.
© Pinnacle Play Systems page 5