Instructions / Assembly

Gable Overhang Assembly & Installation p 2
Step 77: Install bottom of gable overhang, keeping painted side down as shown.
Repeat steps on opposite gable wall.
Step 74c: Align flush with OSB
roof sheet.
Step 74d: Align at peak.
Step 74e: Fasten overhang into
end rafter using 3” galvanized
nails.
Step 75: Repeat previous steps and install back gable overhang. Step 76: Toe nail front and back
overhangs together as shown.
page 29
© Suncast Corporation