Instructions / Assembly

© Suncast Corporation
Step 82: Layout gable overhang
pieces as shown.
White plywood goes on bottom,
OSB goes on top.
Step 83: Assemble gable end box as shown
Gable Overhang Assembly & Installation
Step 81: Install gable end rafters as shown using 16p 3” nails.
Note: Align flush with top of gable rafter, leaving space for additional OSB sheeting.
See step 83... Use 7p 2-1/4”
nails for this application.
Align flush with
end rafter.
Top
Bottom
Step 84: Align gable end box at
center of roof and with edge of
rafter.
page 33