Instructions / Assembly

Bottom Wall Plate Layout
for Units without floor
Step 10: Cut open large package and remove packing materials repeating step 1.
Step 11: Remove top layer of
4’x8’ OSB roof sheeting and
place to the side.
Note: Unpack kit all the way
down to layer 5.
Note: If you purchased the optional floor, please proceed to back wall layout and assembly page.
Step 12: Remove next layer of
kit and set aside.
Step 13: Remove screws from
4’-2”x4” double wall plates and
set aside.
Step 14: Remove all remaining
pieces (excluding pressure treat-
ed 2”x4” bottom wall plates)
Step 15: Measure a square
pad at 13’8”x24’ and snap lines
as shown. Make sure layout is
square, see step 19.
page 8
© Suncast Corporation