Instructions / Assembly

Step G6: Install siding, keep-
ing top of siding flush with line
snapped on previous step.
Step G8: Install gable roof siding after installing end rafter repeating steps from opposite gable wall. Cut
out excess siding at top of door opening.
Step G7: Cutout overhead door opening using a skill saw or router.
Step G9: Install trim filler strips at border of overhead door opening as shown.
page 46
© Suncast Corporation