Instructions / Assembly
Gable Overhang Assembly & Installation
Step 87: Layout gable overhang
pieces as shown.
White plywood goes on bottom,
OSB goes on top.
See step 88... Use 7p 2-1/4”
nails for this application.
© Suncast Corporation
Step 88: Assemble gable end box as shown.
Note: There are two long gable end boxes, one left and one
right, and two short gable end boxes, one left and one right.
Make sure to assemble properly
.
Step 89: Align gable end box at
center of roof and with edge of
end rafter.
page 28
Align flush with
end rafter.
Step 86: Install gable end rafters as shown using 16p 3” nails.
Note: Align flush with top of gable rafter, leaving space for additional OSB sheeting.