Instructions / Assembly
Step 38: Window Layout
should look like this.
Step 39: The wall is now ready
for siding installation.
Step 40: Layout front siding
pieces as shown.
Siding Measurements:
2 - 1’x90”, 2 - 4’x90”
2 - 16-3/4”x4’ (for top of door)
Step 37: Nail wall together using 12p 3” nails as shown.
Step 41: Begin with 4’x90” sid-
ing pieces on either side of
door, keeping 1/2” away from
edge of 2x4. Nail 4’x90” across
top only and only one nail at
bottom doorway corner of
siding piece.
Note: Left side of door
should have siding underlap.
Note: Right side of door
should have siding overlap.
Step 43: Before nailing rest of
siding, make sure that door
opening is square. Door is
square when corner to corner
diagonal measurements are
equal.
1/2”
Reveal
3/4”
Reveal
Step 42: Install 16-3/4”x4’ sid-
ing piece at top of door way -
nail across top only.
page 17
© Suncast Corporation
One Nail
Here
1’x90”
4’x90”
4’x16-3/4”