Instructions / Assembly

Step 29: Paint playhouse and
trim desired colors, with paint
purchased separately.
Step 30: Apply victorian style trim to gable ends. Align trim flush
with front roof edge and top of plywood. Nail with 2 nails at bottom.
of trim piece. Keep nails up so metal drip edge will cover.
Note: Do not nail trim at peak until back trim piece is aligned
and fastened at bottom.
Step 31: Repeat on back side of gable. Nail peak only after front
and back pieces have both been nailed at the bottom. Line up
points and nail peak. Finish nailing trim every 12". Repeat steps 30
and 31 on opposite gable end.
See step 32 on following
page...
Step 27 (... cont) nail V-strip
into plywood at top and bottom
of strip (if nails stick out
through roof, bend flat against
roof).
Playhouse should now look like
this.
page 9
© Suncast Corporation
Step 28: From outside, screw
through plywood into V strips.
Use 14 1-1/4” screws per val-
ley (make sure screws are kept
within 1 ¼ " of valley).