Instructions / Assembly

Step 26: Install H-clips and insert ripped roofing plywood to com-
plete back roof. Nail plywood into rafters repeating previous steps.
Step 27: Insert the two V-cut
strips of wood on the inside
valley of dormer, keeping
angled end into bottom corner
(cont...)
Step 23: Install dormer plywood sections as shown pushing plywood tight against large plywood sec-
tion.
Note: The plywood should not overhang front of dormer by more than 1/2”.
page 8
© Suncast Corporation
Step 24: Repeat on opposite
side of dormer.
No more
than 1/2”
overhang
Step 25: Install plywood roof sheathing on the back side. Start with
full 4x8 piece on the bottom & keep it flush with edges of gable
rafters and edge of wall plate as shown. Nail into rafters every 8”.