Instructions / Assembly

Step 21: Insert dormer siding section as shown, align edges and
fasten to inside of rafter. Nail every 8".
See step 22...
page 7
© Suncast Corporation
Step 19: Set dormer section on top of wall and fasten to wall plate,
keeping edges flush. Fasten dormer ridgepole to peak ridgepole
aligning with marks on peak ridgepole.
Step 20: Align back rafter with
dormer ridgepole and cen-
tered at mark on wall top
plate. Toenail rafter to ridge-
pole and back wall.
Step 22: Install front plywood on each side of dormer, fasten only bottom to each rafter. Install H-
clips at top of plywood and insert top plywood strips. After all front plywood sections are in place, nail
front plywood sections to rafters spacing nails 8” apart.
H-clip