Instructions / Assembly
Step 6: Set up back wall (be sure ends are flush with floor) & nail
bottom plate into floor every 12” as shown.
Note: Before nailing make sure bottom wall plate and siding
overhang are tight against the floor.
Step 7: Remove door stabiliz-
er from front wall section.
Step 8: Set front wall repeating
previous steps.
Note: Make sure front door
reveal is consistently
spaced before fastening bot-
tom plate to floor.
page 4
© Suncast Corporation
Step 5:Set floor on leveled
site. If needed, level site with
2" of stone or gravel. It is
very important for site to be
level.
Step 4: Assemble floor sections by aligning black marks on floor
and fastening together using pre-drilled screws. Make sure floor
edges are precisely flush.
flush
Step 9: Set gable wall section
repeating previous steps.
Note: Gable sections are
interchangeable, place wall
with large door on desired
gable end.










