operation manual
43
Start-up
6.2 Installation
For comfortable installation you can pull the ca-
ble through the cable inlets after having removed
the breakout openings.
To install the switch actuator, please proceed as follows:
• Open the cover
(B)
. Therefore, unscrew both
lower screws with an appropriate screwdriver and
remove the cover afterwards (
see fig. 2+3).
• Connect the phase conductor to connecting ter-
minal L (C).
• Connect the neutral conductor to connecting
terminal N (D).
• Connect the protective conductor to connecting
terminal PE (E).
• Connect e.g. the boiler to connecting terminal 1
(F) or a circulation pump to the connecting ter-
minals of the switching channel 2 (G).
• You can expand the installation depending on the
installation conditions or according to your per-
sonal needs. For further information regarding the
connection options, please refer to section „6.3
Connections“ on page 44.
• Close the cover again. Therefore, push the latch-
es of the cover into the openings provided and
fasten the screws.