operation manual

50
Start-up
6.3 Connections
6.3.1 Boiler connection
PE
1.1
PE
1.2
L
2.1
L
2.2
N
3.1
N
3.2
1
4.1
1
5.3
L
4.2
2
5.1
L
5.2
N
L