Instructions

40
Start-up
Lead the supply cable through the opening of the
cable gland so that the nut can be screwed on
again afterwards.
Extend the first 15 cm of the cable and tighten the
nut below 15cm on the cable gland (see figure
5+6).
Lead the cable with the cable gland through the
housing opening provided for it (see figure 7).
Lead the locknut over the end of the cable and
screw it onto the cable gland (see figure 8).
To tighten or loosen the nut, you can optionally
use an open-end wrench (see figure 9).
Connect the cable to the connecting terminals
on the housing cover (see figure 8).
To connect or loosen the conductor, the white
actuation lever at the top of the clamp has to be
pressed.
Place the housing cover back on and close the
device using the screws.
Provide power supply for the device using the
power supply unit.