User manual

52
Start-up
Latch the floor heating actuator by pressing the
spring latches (E) upwards (see fig. 3).
Make sure that the spring latches are completely
latched and that the device is seated solidly on
the rail.
Place the transformer next to the floor heating
actuator onto the DIN rail (see fig. 4).
Latch the transformer by pressing the spring latch
upwards (see fig. 4).
Make sure that the spring latch engages properly
and that the device is securely seated on the rail.
6 Start-up
6.1 Installation instructions
Please read this entire section before starting to
install the device.
Please note! Only to be installed by persons
with the relevant electro-technical knowledge
and experience!*
Incorrect installation can put
your own life at risk;
and the lives of other users of the electrical sys-
tem.