Installation Guide

Table Of Contents
Doc. ID: 282 Rev: 3 Effective: 6-27-2022 Page | 3
to proceed until the permanent heating and/or air conditioning system is fully operational.
Your job site should have a consistent temperature of 60°F-80°F and relative humidity (RH) of 35%-55% which should be maintained
continuously thereafter.
Basements and Crawl Spaces
Concrete slab or ground must be dry. The ground in the crawl spaces must be completely covered using 6 mil black polyethylene. Crawl
space clearance between the earth and underside of joists should be no less than 18 inches and the perimeter vent area should be equal to
1.5% of the total square footage of the crawl space or as mandated by code.
Concrete Subfloor Requirements
It must have minimum rated strength of 3000 psi.
It must be flat. It should be flat to within 1/8” in a 6-foot span or 3/16” in a 10-foot span; no bumps or low spots. High spots can be removed
by grinding; depressions can be filled with patching compound formulated for use in floor installation.
It must be clean; no construction debris, soil, mud and any other objects on/or adhering to the floor; if necessary, scrape and sweep away
before the installation; no protrusions of nails, debris, metals should remain.
New concrete slab must cure for at least 60 days. It must have a minimum 10 mil polyethylene sheet between the ground and the concrete.
It must meet concrete moisture requirement below.
It must be free from moisture related conditions which can damage the installed flooring.
Light Weight Concrete
It is concrete which rated strength is less than 3000 psi.
Perform a quick check by drawing a nail across the top; if it leaves indentation, it is probably light concrete.
For glue-down application, the concrete must possess shear strength greater than the glue. If concrete rated psi is unknown, contact the
adhesive manufacturer for guidance.
Concrete Moisture
All concrete subfloors should be tested for moisture content and the results documented. Visual checks are not reliable. Perform tests at
locations around exterior doorways, near walls containing plumbing, near foundation walls and in the center of the room. Minimum sample
size is 3 per 1000 square feet of area and one test for every additional 1000 square feet thereafter.
Its moisture content should meet one of the following criteria below:
4.5% when tested using Tramex Concrete Moisture Encounter
Less than 3 pounds per 1000 square feet per 24 hours when using Calcium Chloride test (ASTM F 1869)
75% when using Relative Humidity Testing (ASTM F-2170).
Please note: Concrete moisture content may be acceptable the time of the test, but these tests do not guarantee a perpetual “dry” concrete
slab. The concrete slab moisture content can vary at other times of the year. We are not responsible for moisture related damage to
installed flooring.
Wood Subfloor Requirements
It must be clean; no presence of construction debris, soil, mud and any other objects on or adhering to the floor; no protrusions of nails,
debris, metals should remain. If necessary, scrape and sweep the subfloor before the installation.
It must be structurally sound and stable: no movements or squeaks, no loose panels or loose nails, no signs of ply de-lamination or other
damages. Repair all shortcomings before installation.
It must be flat with no visible bumps or low spots; the subfloor should be flat to within 1/8” in 6 feet span or 3/16” in 10 feet.
Test for moisture using reliable moisture meter. Perform tests at locations around exterior doorways, near foundation walls, near walls
containing plumbing lines and in the center of the room. Measure 20 locations per 1000 square feet.
Moisture content of subfloor should be less than 12%.
Moisture content difference between subfloor and acclimated flooring should be 4% or less.
Plywood or Oriented Strand Board (OSB) Specifications
On truss/joist spacing of 16” (406mm) O/C or less, the industry standard for single-panel subflooring is minimum 5/8” (19/32”, 15.1 mm) CD
Exposure 1 plywood subfloor panels (CD Exposure 1) or 23/32OSB Exposure 1 subfloor panels, 4’ x 8' sheets. Expansion gap between panels
should be 1/8” (3 mm). If panels are not tongued and grooved and there is not sufficient spacing or is inadequate, cut in the required spacing
with a circular saw. Do not cut in expansion space on tongue and groove panels.
Particle Board or Fiber Board
Only for floating installation.
Existing Floors
Installation over existing floor requires the installer to consider potential issues related to moisture damage, adhesive failure and fastener
failure. Acceptable floor coverings include: solid hardwood, linoleum, terrazzo, ceramic tile and other “moisture sealing floors.”
Unacceptable floor coverings include: carpet, needle punch felt, edge glued linoleum and other “moisture absorbing flooring.”
Radiant Heated Subfloor
This product can be installed over radiant heated subfloor. Operating surface temperature must be less than 84°F. Decrease temperature
before installation. Increase temperature gradually after installation. Contact heater manufacturer for specific installation instruction.