RN104 Installation Instructions IN079 Rev B 0118 3 Saber Way, Ward Hill, MA 01835 | homeaire.
Fan Installation & Operating Instructions RN104 Please Read and Save These Instructions. DO NOT CONNECT POWER SUPPLY UNTIL FAN IS COMPLETELY INSTALLED. MAKE SURE ELECTRICAL SERVICE TO FAN IS LOCKED IN “OFF” POSITION. DISCONNECT POWER BEFORE SERVICING FAN. 1. WARNING! For General Ventilating Use Only. Do Not Use to Exhaust Hazardous, Corrosive or Explosive Materials, Gases or Vapors. 2.
Fan Installation & Operating Instructions RN104 | P/N 23060 1.0 SYSTEM DESIGN CONSIDERATIONS 1.1 INTRODUCTION The RN104 radon fan is intended for use by trained, professional, certified/licensed radon mitigators. The purpose of these instructions is to provide additional guidance for the most effective use of RN104. These instructions should be considered supplemental to EPA/radon industry standard practices, state and local building codes and regulations.
1.7 CONDENSATION & DRAINAGE Condensation is formed in the piping of a mitigation system when the air in the piping is chilled below its dew point. This can occur at points where the system piping goes through unheated space such as an attic, garage or outside. The system design must provide a means for water to drain back to a slab hole to remove the condensation. The RN104 MUST be mounted vertically plumb and level, with the outlet pointing up for proper drainage through the fan.
2.0 INSTALLATION The RN104 can be mounted indoors or outdoors. (It Typical RN104 Outdoor Installation is suggested that EPA and radon mitigation standards recommendations be followed in choosing the fan location.) The RN104 Fan may be mounted directly on the system piping or fastened to a supporting structure by means of an optional mounting bracket. The ducting from the fan to the outside of the building has a strong effect on noise and fan energy use.
2.6 OPERATION CHECKS & ANNUAL SYSTEM MAINTENANCE ______ Verify all connections are tight and leak-free. ______ Ensure the RN104 fan and all ducting are secure and vibration-free. ______ Verify system vacuum pressure with manometer. Insure vacuum pressure is within normal operating range and less than the maximum recommended operating pressure.
IMPORTANT INSTRUCTIONS TO INSTALLER Inspect the HomeAire™ RN Series Fan for shipping damage within 15 days of receipt. Notify HomeAire of any damages immediately. HomeAire is not responsible for damages incurred during shipping. However, for your benefit, HomeAire does insure shipments. There are no user serviceable parts inside the fan. Do not attempt to open the housing. Return unit to factory for service.