Instructions / Assembly
Installation Instructions for Corrugated Stainless Steel
and Copper Water Heater Connectors
Improper installation can cause failure, leaks, floods, and property damage.
Always follow building codes and construction standards.
➢ Shut off water, gas, and electricity to appliance before installing.
➢ Select proper length for the job.
➢ Minimum bend radius is 2.5”
➢ Inspect product before installing.
➢ This part must be inspected after installation every six months thereafter (more frequently if
you have “hard water”).
➢ For use with:
o Water in accessible locations only.
o Continuous pressure less than 125 psi and maximum intermittent impulse pressure of
180 psi.
o Continuous temperature less than 160°F maximum; intermittent exposure of 180°F.
DO NOT:
✓ Use for gas.
✓ Install with twists, kinks, sharp angles, or loops in the line which can damage line
internally.
✓ Use if damaged in any way.
✓ Use thread lubricants, tape, or putty.
✓ OVER-TIGHTEN.
o Over tightening can damage line, connectors, and seals.
o Metal Nuts – HAND-TIGHTEN plus ¼ turn with wrench.
Shut water off immediately and replace if signs of damage, cracks, kinks, twists, corrosion, wear,
breaks leaks, or weeping.
DO NOT reuse.