Installation Guide

Installation Instructions for Corrugated Stainless Steel
and Copper Water Heater Connectors
Improper installation can cause failure, leaks, floods, and property damage.
Always follow building codes and construction standards.
Shut off water, gas, and electricity to appliance before installing.
Select proper length for the job.
Minimum bend radius is 2.5”
Inspect product before installing.
This part must be inspected after installation every six months thereafter (more frequently if
you have “hard water”).
For use with:
o Water in accessible locations only.
o Continuous pressure less than 125 psi and maximum intermittent impulse pressure of
180 psi.
o Continuous temperature less than 160°F maximum; intermittent exposure of 180°F.
DO NOT:
Use for gas.
Install with twists, kinks, sharp angles, or loops in the line which can damage line
internally.
Use if damaged in any way.
Use thread lubricants, tape, or putty.
OVER-TIGHTEN.
o Over tightening can damage line, connectors, and seals.
o Metal Nuts HAND-TIGHTEN plus ¼ turn with wrench.
Shut water off immediately and replace if signs of damage, cracks, kinks, twists, corrosion, wear,
breaks leaks, or weeping.
DO NOT reuse.

Summary of content (1 pages)