Installation Guide
STEP 5:
Attach 1 x 2 furring strips to wall studs directly below 
the “wall cabinet bottom level line” with wood screws 
(ILLUSTRATION C). These temporary support strips 
will help to support the weight of the cabinets during 
installation, and ensure that the cabinets are level. You 
are now ready to begin the cabinetry installation. It is 
recommended that you remove all doors, drawers, 
shelves and roll-out trays from each cabinet prior to 
installing to prevent damage. Consult your cabinetry 
manufacturer’s website for door/drawer removal and 
adjustments. For ease of installation, begin by installing wall cabinets first.
Take a look at our Care and Adjustment Guide.
STEP 6:
Refer to your design layout to determine what wall 
corner cabinet to start with (if there is a corner 
cabinet), and place it on the floor below where it will 
be installed. Measure from the corner to the first wall 
stud and transfer this measurement to the inside of 
the wall cabinet. Repeat for next stud location. Now 
measure down 3/4” from inside top of cabinet, and 
3/4” from inside bottom of cabinet and intersect these 
measurements with the stud location measurements. 
Drill through the wall cabinet back using a 3/32” drill 
bit. Repeat process for adjacent corner back panel. 
Raise cabinet into place resting on temporary rails 
and fasten the cabinet to the wall with #10 x 2-1/2” 
pan head screws but do not fully tighten. Check for 
level and shim where necessary (ILLUSTRATION D). 
You may also construct a support wood “T” brace to 
hold the front edge of cabinet in place until you have 
attached to wall (ILLUSTRATION D1).
If your design includes a blind wall cabinet 
(ILLUSTRATION E) instead of a wall corner cabinet, 
consult your design to determine the distance the 
cabinet is to be installed from the wall corner. Always measure distance using the front frame width 
of the cabinet and not the end panel width of the cabinet. Place cabinet on floor below where it will 
be installed and repeat all measuring and pre-drilling as detailed in Step #5. Raise cabinet into place 
resting on temporary rails and fasten to wall with #10 x 2-1/2” pan head screws but do not fully 
tighten. Check for level and shim where necessary.
Furring strips
Floor
ILLUSTRATION C
Floor
Shim
ILLUSTRATION D
ILLUSTRATION EILLUSTRATION D1
Blind Wall Cabinet
Top View 
3” Filler 






