Instructions / Assembly

4
STEP 2 - Support Assembly
Slide all Vertical Leg Extensions (3) onto the Leg Base
(2) as shown
STEP 3-Top Rail Assembly
Two people will be necessary at this point to assemble the
trampoline. One person lifts the Support Assembly from
step 1 to a standing (vertical) position and inserts one of
the sockets of the Top Rail with Sockets (1) into the Vertical
Leg Extension portion of the Support Assembly. The other
person holds the other end and inserts that portion into the
other Support Assembly as shown. You should now have 2
Support Assemblies held together by 1 Top Rail with
Socket
STEP 4 - Trampoline Mat Assembly
When Attaching springs to the trampoline mat, Please be careful. You will need another person to help you
with this portion of the assembly. CAREFUL-When attaching the springs, the Connector Points can become
pinch points since the trampoline is tightening up.
A. Lay out the Trampoline Mat (1) inside the frame
B. How to use the spring special tool.
STEP I : Position the spring on the eyelet of the jumping mat, attach tool and link up to the end of the
spring hook.