Instructions / Assembly

3
REMEMBER TO USE GLOVES DURING ASSEMBLY TO AVOID PINCHING and IT WILL TAKE AT LEAST
TWO PEOPLE TO ASSEMBLE THE TRAMPOLINE
STEP 1 – Frame Layout
Please select your OWN tubing parts’ quantity according to the products in your hand from following
illustrations. All parts with the same par # are interchangeable and have not “right” or “left” orientation, to
connect the parts, simply slide section tubing that is smaller on one end into the adjacent section that has a
larger opening. These joints are called “connector points”