Instructions
ASSEMBLY
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at 14
LSR10HQ, LSR15HQ
Despite all the safety devices and remains her good common sense and your appropriate
technical qualification / training on the operation of a machine such as the LSR 10HQ / 15HQ of
the most important safety factor!
13 ASSEMBLY
13.1 Installation Supporting base
When drilling the holes to the proper spacing. The schematic diagram (on page 10) shows the
distances.
13.1.1 Walls, columns, floor and ceiling mounting
The base mount with 4 screws must be securely 10x60mm (better longer) are attached to stable
wall or ceiling.
The use of anchor bolts with appropriate washers or attachment to a component is strongly
recommended.
NOTE:
Dimensions for drilling
distances.
14 OPERATION
If the hose can be rolled out in full length, not huge move on, as this may
tear the hose and the hose-end residual dangerous swirl around
14.1 Rolling out/ pulling the hose
Remove hose to the desired length and can withdraw slowly clicks into place.
If the hose reel does not lock the same again again go out and leave to withdraw slowly.
Repeat the process locked in the desired position until the hose reel.
If the hose is released during the roll up the hose end to uncontrolled fast
take-up reel. Themselves and other people can thereby be injured or
property damaged. Why not let the hose when rolling. Always lead to the
end of the hose controlled take-up reel.