Installation Guide
 TESTRITE® Safety & Usage Instructions** 
 (800) 321-0316 www.holdrite.com  HOLDRITE® 2016 92-001872-000 (Rev C)   
Install Clean Out Tee, per 
best practice; for PVC &ABS 
with cement (do not get glue 
where test device O-ring 
must seal) or for No-Hub Cast 
Iron with no-hub couplings 
(2). 
Remove Spanner Ring and 
Clean Out Plug. 
 Insert Test Wedge into Clean Out Tee, with 
“pressure side” up. (Prior to installation, be 
sure all contact surfaces are clean and free of 
excess glue, etc.)  
Hand tighten fill/drain stem into Test Wedge clockwise until 
snug. 
 TEST READY 
**WARNING: Avoid potential damage or injury – close spanner ring securely and DO NOT open while under pressure. 
STEP 1 
STEP 2 
STEP 3 
STEP 4 
STEP 5 
STEP 6a** 
STEP 6b** 
STEP 7** 
STEP 8a** 
STEP 8b** 
STEP 9** 
STEP 10 
Confirm that hose is not attached to water source. Rotate 
spigot ball valve to open position (See Fig D.) Completely 
drain water out. 
After water is drained, remove 
Spanner Ring. Remove Test 
Wedge (with proper care and 
handling Test Wedge can be re-
used many times). 
Re-install Clean Out Plug and Spanner Ring into Clean 
Out Tee. Tighten completely (utilize spanner wrench). 
TEST COMPLETE. 
To release water down pipe stack, rotate valve stem to the 
left (counterclockwise) several full rotations (See Fig C.). 
If using Test Wedge with valve stem, turn spigot ball valve to the “closed” position (See Fig A). 
Fill pipe stack (maximum 50’ head/22PSI). 
Re-install Spanner Ring onto Clean Out Tee. 
Tighten completely (utilize spanner wrench). 
Make sure ball valve is in open position (See Fig B). Fill pipe 
stack (maximum 50’/22PSI). Then close spigot ball valve. 
IF FILLING SYSTEM WITH WATER FROM ABOVE 
FILL/DRAIN THROUGH VALVE STEM 
METHOD (For Test Wedge with integral 
rotary valve only) 
RELEASE WATER DOWN 
STACK 
RELEASE WATER THROUGH VALVE 
STEM WITH HOSE ATTACHED (For 
Test Wedge with integral rotary 
valve only) 
Fig. A 
CLOSED 
OPEN 
OPEN 
Fig. D 
Fig. B 


