Instructions / Assembly

STEP 5 (“-B” MODELS ONLY)
STEP 7
STEP 9
STEP 8
Place door into position by
tilting it forward into the side
channels just below the Top
ange and slide it upward.
Tilt the bottom of the door
into place so it is ush to the
front (see Fig. 9). Slide down
and lock door’s bottom tab
into the front Bottom beam
channel.
HOLDRITE caries water heater connectors, water heater restraints,
water heater drain pans and equipment platforms. Learn more:
www.HOLDRITE.com/products/water-heater-accessories/
77-002018-000 RevC
Finish installing water heater plumbing and venting per local code and water
heater manufacturer’s instructions.
It is recommended (and local codes may require) that your QUICK SHED™ be
attached to the adjoining building structure using proper fasteners, such as
screws or anchors (not included). If installing QUICK SHED™ free-standing
(ie. with Rear Panel), anchorage to the slab/floor is recommended. Use
remaining pre-drilled holes in back anges or self-drill as needed.
If installing a Rear Panel on the QUICKSHED instead of
attaching it to an adjoining building structure, complete
Steps 1-4 of the box instructions and the plumbing and
venting installation per Step 5, then proceed. If B model
with Rear Panel is not being installed, skip to Step 9.
(800) 321-0316 | www.HOLDRITE.com
(800) 321-0316 | www.HOLDRITE.com
— Carries A FULL LINE OF —
WATER HEATER ACCESSORIES!
Fig. #8
Fig. #9
QUICK SHED™
WATER HEATER ENCLOSURE
#QS-E24, #QS-E26, #QS-E30
WATER HEATER ENCLOSURE with BACK PANEL
#QS-E24-B, #QS-E26-B, #QS-E30-B
Align the holes of the
second Bottom beam with
the fastener holes of both
Side panels (positioned
at the front of the QUICK
SHED™) and install two
Screws (included) for each
side with screw driver, until
hand tight (see Fig. 5).
STEP 6 (“-B” MODELS ONLY)