1. Select desired location
for
wall
mount
platform (STUDS
MUST
BE 16"
CENTER
SPACING MAXIMUM).
2. Use template printed on bottom
of
platform
box
to
mark
four attachments points on wall surface; verify that template is held level
when making marks. (See
Fig
#6A}
3. Use
box
template lay-out marks (step 2 above) to
draw
upper and lower horizontal lines on wall surface. (See
Fig
#6A}
3.1. Lines
must
span completely across three studs (16" center stud spacing maximum).
4. Locate the center line
of
each wood
or
metal stud,
mark
intersection point with horizontal lines. Six center points must be located -
two
on each
of
three studs. (See
Fig
#68)
4.1. On either Wood
or
Metal Stud Framing drill
W'
pilot holes in 12 locations (2
for
each
of
6 item
'P\
brackets). (See
Fig
#6A
and
#68}
4.2. On Metal Framed Walls
Only-
Using
Y4"
pilot holes as guides (from step
4.1
above),
drill%"
holes to accept Toggler® Bolts
(item 'F1') in 121ocations. (See
Fig
#68}
4.3. On Metal Framed Walls
Only-
Install 12 Toggler® bolt items 'F1' in the %" holes. (See
Fig
#7 A
and
#78}
5. Pre-assemble three item
'P\
brackets
to
each
of
two
item 'G' Unistrut Channels (channels must be 36" minimum length) using
hardware items 'C', 'D' and 'H'. (See
Fig
#SA
and
#88)
5.1. Build
two
Fig
#8A
assemblies (Only hand-tighten these hardware components at this point)
6. Mount both the upper and lower unistrut assemblies to the wall. (See
Fig
#9}
6.1. For Wood Framed Walls
Only-
Use lag bolt item 'E' (12 ea.) and
washer
item 'C' (12 ea.)
6.2. For Metal Framed Walls
Only-
Use Toggler® Bolt item 'F2' (12 ea.) and
washer
item 'C' (12 ea.)
7. Tighten all hardware securely (If vibrating equipment will be mounted, Loctite®
or
similar is recommended)
8. Locate the four equipment platform mounting locations and
mark
these onto the Unistrut® assemblies.
(See
Fig
#10A
for
locations
or
use
the
box
template}
9. Install the
four
Unistrut® channel studs, item 'H' in the locations located in step 8 above using items
'1',
'C' and 'D'. (See
Fig
#108}
10. Affix 45° Brackets 'J' (4) to ends
of
both 3/8" threaded rods item
'Q'.
(See
Fig
#11}
11.
Affix one rod assembly to each
of
the upper two Strut Channel Studs item 'H' and Suspension Washer item 'I' under nut and washer 'C' & 'D'.
12. Refer to steps 6 thru
11
on page 5 (CONCRETE - Steps 6-11) to complete the platform installation.
DRAW
LINES
ON
WALL
SURFACE
(LEVEL)
Fig
#6A
Fig
#8A
16""
ON
CENTER
STUDS
BOX
TEMPLATE
ANCHOR
LAYOUT
POINTS
(4
PLACES)
Fig
#6B
(&PLACES)
Fig
#8B
(&PLACES)
STEP
4.1
WOOD
OR
METAL
STUDS
DRILL
114"'
PILOT
HOLES
(2
PLACES)
STEP4.2
METAL
STUDS
ONLY
DRILL
3/4"
THROUGH
DRYWALL
AND
METAL
STUDS
(2
PLACES)
Fig
#7A
Fig
#10A
Fig
#108
NOTE: INSTALL TOGGLER®
BOLT
3/8"'-16 PER MANUFACTURER'S
INSTRUCTIONS.
314"