Installation Guide
Page 6
Installation Instructions
All Models
Fig #7
STEP 4 - GLAZING THE PANEL
Place the panel into the bottom channel and wall channel (Fig #6)
Insert 2 pieces of bottom vinyl Item (4)
one on either side of the glass panel and tap into
Option 1 - Dry glaze:
will snap into place. See Fig. #3 Use on Bottom
both sides.
Run a bead of silicone in the gap
allow proper curing of the silicone
a. Run a bead of silicone along the joint on
place with a block of wood and a mallet. The vinyl
Channel, Wall Channel and Ceiling Channel.
the outside where the metal channels meet the
Option 2 - Wet Glaze:
between the glass and the inside of the channels on
STEP 5 - FINAL SEALING
c. We recommend waiting 72 hours before the shower is used to
wall channel (3) and secure with silicone.
b. Optionally add a U-channel end cap to the top of the vertical
threshold, and wall. (Fig #7)
FINAL SEAL
Seal both sides
where channels and
tile meet.
Fig #6