Installation Guide
1/16" Gap
#3
Outside
#2
#1
Side
against
Wall
Slide door
over wall channel
Butted together
treat as one
continuous
piece latch jamb
Door-to-Latch
Gap (1/16” to 1/8”)
S
3 - screws #24
ecure with 
 Strike Plate #9
Magnetic Catch #25
Measure from edge of glass
to outside of hinge rail
Hinge
Rail
Notched
Side
Drip Deflector
on inside
Inside 
Handle
#20
Style Washers
are Optional
Magnet Catch
centered on 
handle
STEP 5 - Clear-Poly Latch Jamb (#7)
* Measure from top of 3/8” Glass Panel #18 to top of the 
 Buttress.
* Take Clear-Poly Latch Jamb assembly, and remove the Bulb 
 Seal and Strike Plate, set them aside for later step.
* Cut Clear-Poly Latch #7 to above dimension using a 24 tooth 
 hatch-saw. Power saw may damage latch.
* Notch the bottom of the Clear-Poly Latch to fit over the end 
 of the Panel Sill #5 (trim legs up 3/4”).
* Apply the Clear-Poly Latch Jamb on edge of Glass with latch 
 inside unit ensuring it is flush with the top of the Fixed panel.
* Measure from the bottom of the notched Poly Latch to top of 
 the Curb Filler. Cut the Buttress Poly latch #10 to this length. 
 Insert into Vertical channel and butt to bottom of upper poly 
 latch. 
#4
#4
#7
#10
#5
#5
Detail
Front
View
3/8
Panel
3/8
Panel
Top of 
Buttress
Top of 
3/8 Glass
Measure
STEP 6 - Attach Door-Side Wall Channel (#3)
* Set door-side Wall Channel #3 in place against the door side 
 wall, on top of the Curb Filler. 
* Gap the bottom of the wall channel 1/16" from the vertical 
 water dam of the Curb Filler (This will allow the room for the 
 Door assembly to slide over.) 
* Plumb Wall Channel, mark the hole locations on wall and 
 remove Wall Channel. 
* Drill holes with 3/16" bit, insert 3 - #22 Wall Anchors, re-install 
* Wall channel and secure with 3 - #21 Screws.
#4
#7
#10
#5
3/8
Panel
STEP 7 - Door Assembly / Pre-Hanging Prep
* Attach Pull - Handle #20 to Door.
* Dry run the position of Magnetic Catch Assembly, #25, 
 #26 and mark location with marker on glass.
* Apply small bead of silicone inside Catch Assembly 
 and work onto edge of glass at mark. Let silicone dry.
STEP 8 - Hang Door Assembly
* Slide door assembly over the Wall Channel. (Step 6)
* Adjust door until top edge of the door is level and flush 
 with top of 3/8” Glass Panel.
* Also ensure door-to-latch gap is consistent from bottom
 to top. 
* When aligned, secure Door Assembly to Wall Channel 
 with 3 - #24 screws using factory pilot holes in the 
 Hinge Jamb.
Finish Latch 
* Temporarily slide Strike Plate #9 into Clear-Poly Latch 
 #7, align with Magnetic Catch #25. 
* Mark top and bottom of Strike Plate onto Latch. 
* Mark and cut Bulb Seal #8 to proper length.
* From top of latch, re-insert bottom bulb seal, strike and 
 top seal. Dabs of silicone may be required to secure 
 Bulb Seals and Strike in place. Hold with Painters tape 
 while drying.
Butt
together
STEP 8 - Bottom Sweep Fitting (#19)
* Measure the Door Glass including Hinge Rail. 
* Subtract 1/16" and cut the Bottom sweep to this length. 
* IMPORTANT: The sweep is notch on both ends. You 
 must leave the notch that goes under the Hinge Rail 
 for your door. Cut off the end with the notch you don't 
 need. Trim the inside deflector 3/8" so it will clear the
 Latch Jamb when door is closed.
STEP 10 - Final Sealing / Siliconing the Unit (let dry for 24 hours before use)
* On the outside of the unit, run a bead of silicone down both walls and across the bottom where the metal meets
 the walls and base. Apply a dab of silicone at the bottom of the latch jamb where it meets the Curb Filler.
Page 8
3/4"
Notch










