Install Instructions

2
Figure 1
INSTALLATION
1.The spring pilot valve can be installed on either
side of the main valve. The main valve is
shipped with the U-tubing and the bleed orifice
installed for left-hand side mounting of the spring
pilot valve. If right-hand side mounting of the
spring pilot is desired, the U-tubing and the bleed
orifice must be relocated to the opposite sides of
the main valve.
Note: Right-hand side positioning occurs when
the main valve inlet directly faces the observer.
Figure 1 illustrates mounting the spring pilot on the
right-hand side of the main valve.
1/4
"
CONTROL
PIPE
L-TUBING
L-FITTING
TEE
1/4
"
UNION
DO NOT INSULATE
BELOW THIS LINE
MAIN
VALVE
S-TUBING
BLEED ORIFICE
ADJUSTING NUTS
ADJUSTING SPRING
The mounting hardware kits contain all of the hardware required to install the spring pilot valve
on the main valve.
Pipe sealant should be applied to all pipe threads. Do not use Teflon
®
tape. Note: Follow
manufacturer’s instructions for applying pipe sealant. Keep sealant off first thread.
The preformed copper tubing (included in the hardware kits) may have to be shortened with a
tubing cutter. Ream to restore original inside diameter of tubing. Avoid getting chips in the tubing
or piping.